4. Identification of items with higher costs


Analysing costs for 2012, it can be observed that the heavier costs, in the whole of costs ([BCI]       [ECI]), correspond to “direct costs of network-oriented activities”, and that, among them, the most significant costs are those related to “specific telecommunication equipment/networks”, representing [BCI]      [ECI] of total costs.

Table 20. Costs of the DTT service in 2012
[BCI]

COSTS

2012

Percentage of total costs

TOTAL COSTS

 

 

Total direct and joint costs

 

 

Total direct costs

 

 

  Direct costs of products and services

 

 

  Direct costs of customer-oriented activities

 

 

  Direct costs of network-oriented activities

 

 

    Specific telecommunication equipment/networks

 

 

Others

 

 

Total joint costs

 

 

  Joint cost  of customer-oriented activities

 

 

  Joint cost  of network-oriented activities

 

 

Total common costs

 

 

Values in Euros
[ECI]

Breaking down costs related to “specific telecommunication equipment/networks”, it is observed that the main component of these costs concerns DTT equipment (vide Table 21) which represent around [BCI]      [ECI] of total costs, the second most relevant item being staff costs (with a weight by [BCI]       [ECI] of total costs).

Table 21. Costs of the DTT service in 2012 – direct costs of “specific telecommunication equipment/networks”
[BCI]

COSTS

2012

Percentage of costs

Specific telecommunication equipment/networks

 

 

Broadcasting equipment - DTT

 

 

Staff costs

 

 

Others1

 

 

Values in Euros
[ECI]

A broken-down analysis of costs related to the “Broadcasting equipment - DTT” item shows that costs with transmitters are the heaviest ([BCI]      [ECI]), followed by costs with electricity infrastructures ([BCI]       [ECI]).

Table 22. Costs of the DTT service in 2012 – direct costs of “Broadcasting equipment - DTT”
[BCI]

COSTS

2012

Percentage of costs

Broadcasting equipment - DTT

 

 

Transmitters

 

 

Electricity infrastructures

 

 

Others

 

 

Values in Euros
[ECI]

As regards staff costs associated to specific telecommunication equipment/networks (which have a significant weight in the scope of direct costs related to “specific telecommunication equipment/networks”), it is not possible to replicate the amount of [BCI]      [ECI] Euros entered in the CAS with detailed data submitted by MEO, having been obtained a cost, 14% higher than the preceding one, amounting to [BCI]      [ECI] Euros, on the basis of detailed information on staff costs, and taking into account staff costs associated to the description “Broadcasting equipment - DTT”.

Notes
nt_title
 
1 Concerning (i) radiating systems, (ii) containers, (iii) HVAC systems; (iv) SDH-ASI converters, (v) change in frequencies, (vi) head-end, (vii) technical design, (viii) towers, (ix) transmission system, (x) others, (xi) management network and (xii) civil engineering infrastructures, where each represents less than 10% of costs.